Eskan 132/20 kV Substation (Maskan Mehr Golbahar)

  • Client: Khorasan Province Electrical Company
  • Project Status: Completed

This project is defined and implemented in 50m*30m sheltered area in order to
supply the required electrical demand of Golbahar town. This substation included two bays of 132 kV lines and transformers. The capacity of each transformer is 30 MVA.
The main bulk material volume of the project is 700 m3 earth work, 12000 kg bar bending, 300 m3 concreting, 200 tones steel structure and 2100 m3 sandwich panel. 

This substation is the first indoor and DCS-UNMANNED in Iran designed by Khorasan Electric Company Consultants in cooperation with Khorasan (Moniran) consultant group implemented by TAM Iran Khodro.


Eskan 132/20 kV Substation (Maskan Mehr Golbahar)