|
Mes Sarcheshme Complex
|
|
|
|
|
|
 |
|
Renovation and revamping of control system and instrumentation of all Sarcheshmeh cooper complex plants with out interupting the production. Project includes: PLC Simens 400 series. 23.000 I/O-17 local control room and central control room. 2850 instruments. 3 telemetry systems. 30 networks. Fiber optic backbone 200 control board cells. 370 Km cabling and candoit. 50 tons still supports.
|
|